[[File:UI_new_commissioning_task.png|190px|thumb|border|alt= UI Representation of Commissioning Task Objects|UI Representation of Commissioning Task Objects]]
 
{{Attention|Since Version 3.0.0 {{Version/AndroidSince|3.0.0}} Commissioning Objects are handled as [[MRO_Objects_(Client)]]}}
A [[SYSCLS_COMMISSIONINGCHECK|commissioning task]] is a special task object, which displays properties defining the status of the check on the row level directly.
There are two types of commissioning tasks,
* '''state relevant''' tasks which are indicated by a circle with or without a (solid/hollow) check symbol at the left side of the row as well as the "Not Applicable" icon. The later icon is a circle with a diagonal line in it at the end of the row.
* '''non state relevant''' tasks, which can be seen as some kind of informational object which do not have a status. This line is indicated by a white "i" as icon and does not have the "Not Applicable" icon.
# Workpackage status FINISHED | technical status FINISHED
Clicking the button at the bottom attempts to switch the workpackage status,* if . If the workpackage is changed from '''open''' to '''finished''', it triggers a sync of the whole work package. For all state relevant tasks which have not be set an editor will pop up allowing the user to enter the missing value. Cancelling the dialog leaves the task's values value empty. 
{{Attention|Up to now, it is possible to change commissioning tasks even if the work package is finished already.}}
The following images should give an overview about possible states occuring upon using this feature:
<gallery widths="170200" heights="310">File:UI_new_commissioning_task.png|New commissioning workpackage(status 1)File:UI_commissioning_task_not_done_properly.png|Open commissioning workpackage with open child tasks(status 1)File:UI_commissioning_task_done_properlyUI_commissioning_during_finishing_with_applicable.png|Open commissioning workpackage with technically finished tasksFile:UI_commissioning_during_finishing.png|Convinience Convenience method for not technically finished tasks upon closing workpackage. Tasks can be marked as not applicable during finishing workpackages; The delete button is removed. {{Version/AndroidSince|2.5.2}}File:UI_commissioning_task_finished_not_properly.png|Finished commissioning workpackage with open child tasks(status 2)File:UI_commissioning_task_done_properly.png|Open commissioning workpackage with technically finished tasks (status 3)File:UI_commissioning_task_finished_properly.png|Finished commissioning workpackage with technically finished tasks(status 4)
</gallery>
[[Category:Android|Commissioning Objects  == Technical Background == The status of work packages is essentially an Integer property. Currently its value definitions are as follows.* Anything not greater than (UBIK Android)]]0 indicates the package is open;* Anything not less than (≥) 1 indicates the package is finished.