Jump to: navigation, search

Changes


UBIK Studio Manual

60 bytes added, Monday at 05:25
/* 11. Create Workpackages and Tasks */
Workpackages and Tasks are the MRO (Maintenance, Repair and Operations) objects used to structure work to be carried out: a Workpackage groups the individual Tasks through which users report progress, results, and completion of work in the UBIKĀ® client.
Navigate the hierarchy to "WORKPACKAGES MRO workpackages." Right-click this item and select "Derive new Object" to create a new metaclass Metaclass for a new type of Workpackage. The Workpackage name Name can subsequently be adjusted in the ObjectEditor. The name Name should be entered in uppercase letters; the description Description field can be filled in as desired, and there is also an option to enable multilingual support.
{| style="margin-left: 0;"
| [[File:WorkPackage1.png|thumb|none|220px]]
<br>
<br>
To create a new task, use "TASK MRO tasks." Again, right-click and select "Derive new object" to create the metaclass. The task type is determined by the data type; for example, a Texttask requires an additional value property Property of type "string," whereas a check task requires a value property Property of type "bool." This value property Property is then dragged from the CUSTOMMETAPROPERTIES onto the metaclass Metaclass opened in the RelationEditor.
[[File:WP2.png|thumb|none|500px]]
<br style="clear:both" />
By deriving from the TASK MRO task, the task inherits the classification of the parent object. This classification determines the type assigned to the newly created task. You can view the required property Property in the Class Details; to do this, select the cube icon at the top. Then, open the "Task Classification Object"; color-coded markers (red and green) will indicate whether specific properties Properties still need to be added.
<br style="clear:both" />
{| style="margin-left: 0;"
|}
[[Category:Pages with broken file links|UBIK Studio Manual]]
==12. Editors==
189
edits