Jump to: navigation, search

Changes


Timesheets

1,089 bytes added, 8 January
Extracting Timesheets from Scopechanges page
Time Sheets are attachments that document the time or cost of work done for a certain Operation. These can necessary for Operations with a Price Type of ''Running Cost'' or ''Hourly Rate''.

[[File:SC_TSIndicator.png|800px|thumb|none|Timesheet-enabled operations are marked with the above indicator in both the Workorder and Operation views.]]


Time Sheets can be enabled for an Operation:
* During turnaround/shutdown planning by setting the Price Type.
* During execution by clicking the ''Enable Timesheets'' button, found in the Activity Details area of an operation.
** Visibility of this button is limited by user rights.


{{Hint|All Time Sheet-Enabled Operations can be viewed by navigating to the [[Scope_Changes#Overview_of_Scope_Changes_and_Time_Sheets|Scope Changes module]] in the MaTaP client.}}


== Time Sheet-Enabled Work ==
If Time Sheets are enabled, a dedicated tab is added to the Activity Details area where contractors can attached documents to log their work.


[[File:SC_TStab.png|800px]]


A new

[[Category:MaTaP|Timesheets]]
[[Category:MaTaP UWP|Timesheets]]
648
edits