Scope Changes

125 bytes removed, 3 January
/* Mark Planned Work as Timesheet-Enabled */
An admin with the correct user rights can use the ''Enable Timesheets'' button, found in the Activity Details area of an operation.
[[File:SC_TSIndicator.png|800px|thumb|none|Timesheet operations are marked with the above indicator.]]
<br>
Once Timesheets are enabled, a dedicated tab is added to the Activity Details area where contractors can attached documents to log their work.
<br>
[[File:SC_TStab.png]]
A new Timesheet can be added by clicking the ''Add Timesheet'' button. Then, for each added Timesheet, the contractor must input the Cost and a brief Description of their work.