Jump to: navigation, search

Changes


Scope Changes

113 bytes added, 3 January
/* Mark Planned Work as Timesheet-Enabled */ Added images
An admin with the correct user rights can use the ''Enable Timesheets'' button, found in the Activity Details area of an operation.
Timesheet operations are marked with the indicator:
'''IMAGE - timehseet indicator'''
Once Timesheets [[File:SC_TSIndicator.png|800px|thumb|none|Timesheet operations are enabled, a dedicated is added to marked with the Activity Details area where contractors can attached documents to log their workabove indicator. '''IMAGE - Timehseet tab''']]
A new Timesheet can be added by clicking the ''Add Timesheet'' button. Then, for each added Timesheet, the contractor must input the Cost and a brief Description of their work. The MaTaP client tracks the ''Running Cost'' of all attached Timesheets.
<br>
Once Timesheets are enabled, a dedicated tab is added to the Activity Details area where contractors can attached documents to log their work.
<br>
[[File:SC_TStab.png]]
 
A new Timesheet can be added by clicking the ''Add Timesheet'' button. Then, for each added Timesheet, the contractor must input the Cost and a brief Description of their work.
The cost of all attached invoices is tracked as the ''Running Cost'' on that operation.
<br>
 
[[Category:MaTaP|Scope Changes]]
[[Category:MaTaP UWP|Scope Changes]]
== Scopechange Details ==
648
edits