== Key Features ==
The Commissioning Wallpaper functions much like the Turnaround Wallpaper, however, the workpackages shown here represent full sub-systems, rather than individual equipments.
[[File:CommissioningWallpaper.png|1000px]]
One Commissioning Workpackage is displayed as one line in the Commissioning Wallpaper. The main data of the CWO is displayed in the first column:
In the 2nd column the Comment of the CWO is displayed.
== Commissioning Task Tasks ==There are several kinds of task cells on the Commissioning Wallpaper;<div class="mw-collapsible mw-collapsed" data-expandtext="Show Image" data-collapsetext= "Hide Image" style="width:700px;">* '''Standard Commissiong Task Commissioning Tasks (SCT) ===''' represent single tasks to be executed overall on the sub-system.** The cell of one SCT displays the status of the SCT by showing its color:;*WHITE: "** Not Started"*GREEN: "(white) / Ongoing (yellow) / Completed"(green) / NA (gray).*YELLOW: "On Going"*GRAY: "N/A"In the 2nd The second line displays the finishing date is displayed when of the SCT was finished. For ongoing tasks, "-" is displayed otherwise. ** When a clickclicking/tab is made tapping on a SCT, a dialogue appearsshowing its current status and history is displayed. *** The current SCT status can be set and changed using the history four indicators.*** The "Navigate To Turnaround Wallpaper" option opens the Turnaround Wallpaper and applies a filter based on the sub-system of the original SCT are then displayed there.<div class="mw-collapsible-content">
[[File:CommissioningTaskStandardBlured.png|500px]]
</div></div>
<br>
<div class="mw-collapsible mw-collapsed" data-expandtext="Show Image" data-collapsetext="Hide Image" style="width:700px;">
* '''Grouped Commissioning Tasks (GCT)''' represent a group of normal Operations collected under the same sub-system.
** The cell of one GCT displays the status of the GCT by showing its color.
*** Similar to an SCT, the color states for GCT are; Not Started (white) / Ongoing (yellow) / Completed (green) / NA (gray).
** The second line displays the numbers of ''finished / total'' operations.
** When clicking/tapping on a GCT, a dialogue showing its current status and history is displayed.
*** Additionally, it also shows how many operations have already been completed.
*** On a GCT, the only option for changing status is to set ''Complete''. In this case all unfinished Operations belonging to this GCT will be set to finished (100%) and a history entry will be created for the GCT. This option is only available if the status of the GCT is ''Not Started'' or ''Ongoing''. All other status can't be set.
*** The "Navigate To Turnaround Wallpaper" option opens the Turnaround Wallpaper and applies a filter based on the sub-system of the original SCT.
<div class="mw-collapsible-content">
[[File:CommissioningTask.png|500px]]
</div></div>
<br>
* '''Punchpoint Commissioning Tasks (PCT)''' give an overview of the number of completed [[Punchpoints]] of each Priority type (A to D).
** The cell of each Punchpoint column displays the status of the ''highest priority active punchpoint'' by showing its color.
*** However, since each column points to a single priority (A to D), the cell color indicates whether that particular sub-system has no punchpoints (gray), no ''active'' punchpoints (green), or at least 1 currently active punchpoint (respective priority color).
** The count on each PCT shows the ''unfinished / total'' number of punchpoints of that priority for the entire subsystem.
** Clicking/tapping on the PCT opens the Punchpoints page, and applies a filter based on the sub-system of the original PCT.
{{UnderConstructionEnd}}
= Refresh = Refreshing ==
=== Changes made by the user ===
The Commissioning Wallpaper updates itself when one of the following data changes:
* New/deleted Commissioning Codes
* Changed type for Commissioning Code
[[Category:MaTaP|Commissioning Wallpaper]]