* manage process or maintenance data of the plant and its features
* do a high-performance cost-benefit analysis and create key performance indicators
Therefore we need to
{||-| <font color="darkred"><strong>
[[File:ArrowRedRight.png|15 px]] „Dissemble“ the system into theoretical blocks representing the real as well as intangible parts of the system.
<br>
</strong>
</font>
|}
===Plant picture===