Admin Tool Jobs
Job Runs
For every executed Job a Job Run will be scheduled.
Every Job Run has a status. First, it is "Scheduled" then it switches to "Started" and the Interface Execution Timestamp gets set.
If the Job Run was successful it switches to "Sucess". Otherwise, it can either switch to "Error", "Conflict" or "Terminated"
Only if the Job Run was successful the duration will be displayed with the following format HH:MM:SS
All existing Jobs can be found here: Project Page