Changes

UBIK Studio Manual

60 bytes added, 15 July
/* 10. Create Workpackages and Tasks */
[[Category:Pages with broken file links|UBIK Studio Manual]]
==1011. Create Workpackages and Tasks==
Navigate the hierarchy to "WORKPACKAGES MRO workpackages." Right-click this item and select "Derive new Object" to create a new metaclass for a new type of Workpackage [PF20.1][PF20.2]. The work package name can subsequently be adjusted in the ObjectEditor. The name should be entered in uppercase letters; the description field can be filled in as desired, and there is also an option to enable multilingual support. To create a new task, use "TASK MRO tasks." Again, right-click and select "Derive new object" to create the metaclass. The task type is determined by the data type; for example, a Texttask requires an additional value property of type "string," whereas a check task requires a value property of type "bool." This value property is then dragged from the CUSTOMMETAPROPERTIES onto the metaclass opened in the RelationEditor.
|}
[[Category:Pages with broken file links|UBIK Studio Manual]]
==11. Editors==
189
edits