Changes

Turnaround Wallpaper

698 bytes added, 21 May
= Key Features =
- '''Advanced Visualization''': The Turnaround Wallpaper displays WorkOrders and Operations. Operations are each enriched with data such as the responsible company, early start date, late finish date, and the current status using a color-coded system.
- '''Interactive Grid Layout''': Users can navigate through project data via a scrollable grid. This grid includes fixed row headers that are each a WorkOrder and column headers that are each an Activity Code. Operations are categorize according to their WorkOrder and Activity Code.
= Detailed Visualization and Interaction =
** White with an Orange Border: Indicates an operation is overdue but still open or planned.
** Yellow with an Orange Border: Signifies an overdue operation that is currently in progress.
 
= Advanced Sorting and Filtering =
'''Activity Codes''': Each Operation is associated with an Activity Code, which groups one or more Operations belonging to the same WorkOrder.
 
'''Dynamic Filtering Options''':
* '''Row Filters''': Users can filter operations based on the following criteria:
** Plants
** Systems
** Subsystems
** Zones
** Equipment Groups
** Equipment Types
** Contractors
** Operation statuses
** Milestones
** Punch Points
** Tag numbers
** WO/PO numbers
** WO description
** Planners
* '''Column Filters''': Here the user can define a set of colums/ActivityCodes that should be visible.
 
'''Custom Views''': Filter configurations can be saved and later applied as custom views.
241
edits