Changes

Smart Studio

281 bytes added, 12:27, 17 May 2018
/* Worksheets */
So, a project can have multiple worksheets with overlapping content (i.e., models that exist in multiple worksheets). Changing a worksheet can affect other worksheets after saving the change in order to keep consistency (this happens automatically). You can save a (selected) worksheet to the project using the confirm button (the icon is a hook/check symbol) in the tool bar.
After saving the worksheet, the project will be marked as changed and can be saved using {{key press|Ctrl}} + {{key press|S}} or the save symbol in the tool bar, when the project page is selected.
 
Some operations can take a while, for example when a lot of data is loaded into a worksheet. Such tasks can be canceled using the stop symbol in the toolbar or {{key press|Esc}}.
 
[[Category:Pages with broken file links|Smart Studio]]
[[Category:Smart Modelling|Smart Modelling]]
=== Project models ===
1,606
edits