Last modified on 24 October 2024, at 09:31

Commissioning Wallpaper

Revision as of 09:31, 24 October 2024 by ARU (Talk | contribs)

Wiki Under Construction Start.PNG

Key Features

Advanced Visualization: The Commissioning Wallpaper displays Commissioning Workpackages and Commissioning Tasks. The Commissioning Workpackages are linked to their respective WorkOrders on the Turnaround Wallpaper, and the Commissioning Tasks are, in turn, linked to all their associated Operations.

Interactive Grid Layout: Users can navigate through project data via a scrollable grid. This grid includes fixed row headers that are each a Commissioning Workpackage and column headers that are each an Commissioning Code. Commissioning Tasks are categorize according to their Commissioning Workpackage and Commissioning Code.

Detailed Visualization

Commissioning Workpackage (CWO): One Commissioning Workpackage (CWO) is displayed as one line in the Commissioning Wallpaper. The main data of the CWO is displayed in the first column:

CommissioningWorkpackageRow.png

  • System - Name
  • System - Description
  • SubSystem - Name
  • SubSystem - Description
  • Punchpoint info
    • Status Color
    • Number of Punchpoints

In the 2nd column we display the Comment of the CWO.

Sorting

The list of CWOs can be sorted by the Name of the System or the Name of the Sub System.

CommissioningWallpaperSortWorkpackages.png

Filtering The list of CWOs can be filtered by:

  • Plant
  • System
  • Subsystem
  • Zone

The sorting is already implemented and will stay as it is.


Color-Coded Commissioning Task Tiles: Each commissioning task tile is color-coded based on its status to provide quick visual cues about the progress of operations. Only the operations that are assigned to the respective commissioning task are considered:

  • WHITE: "Not started"
    • Not a single operation has its progress status set to N/A or within the 0-100 range.
  • GREEN: "Complete"
    • All operations have a progress status of either N/A or 100.
  • YELLOW: "On Going"
    • At least one of the operations has a progress status set to N/A or within the 0-100 range.
  • DARK GRAY: "Not Applicable"
    • The commissioning task itself is not applicable.

Commissioning Task

When a left-click is made on a commissioning task, a detailed window appears, displaying the following information:

  • Commissioning Code
  • Responsible Company
  • Status of the Commissioning Task
  • History of the change status of the Commissioning Task

CommissioningTask.png

When the status of the commissioning task is changed in this window, all status of the associated operations are also updated.

Wiki Under Construction End.PNG