Jump to: navigation, search

Time Sheets


Revision as of 16:15, 8 January 2025 by REP (Talk | contribs) (Extracting Timesheets from Scopechanges page)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Time Sheets are attachments that document the time or cost of work done for a certain Operation. These can necessary for Operations with a Price Type of Running Cost or Hourly Rate.

Timesheet-enabled operations are marked with the above indicator in both the Workorder and Operation views.


Time Sheets can be enabled for an Operation:

  • During turnaround/shutdown planning by setting the Price Type.
  • During execution by clicking the Enable Timesheets button, found in the Activity Details area of an operation.
    • Visibility of this button is limited by user rights.


IC Hint square.pngAn overview of all Time Sheets can be viewed in the Scope Changes module in the MaTaP client.

Timesheet-Enabled Work

If Time Sheets are enabled, a dedicated tab is added to the Activity Details area where contractors can attached documents to log their work.


SC TStab.png


A new Timesheet can be added by clicking the Add Timesheet button. For each added Timesheet, the contractor must input the Cost and a brief Description of their work. The cost of all attached invoices is tracked as the Running Cost on that operation.

The documents can be viewed (opens up a relevant external app on the same system), and exported after execution.


Budgeting

If a budget has been set for a particular operation, the Running Cost is shown in relation to the overall budget, with a bar showing the overall progress.

IC Attention.png Attaching a Timesheet that would go over the budget for that particular operation will be rejected (as shown with Declined status above).