Jump to: navigation, search

Turnaround Wallpaper


Revision as of 13:53, 21 May 2024 by LMA (Talk | contribs)

Key Features

Advanced Visualization: The Turnaround Wallpaper displays WorkOrders and Operations. Operations are each enriched with data such as the responsible company, early start date, late finish date, and the current status using a color-coded system.

Interactive Grid Layout: Users can navigate through project data via a scrollable grid. This grid includes fixed row headers that are each a WorkOrder and column headers that are each an Activity Code. Operations are categorize according to their WorkOrder and Activity Code.

Detailed Visualization and Interaction

Color-Coded Operation Tiles: Each operation tile is color-coded based on its status to provide quick visual cues about project progress:

  • BLACK: "Undefined Status"
  • DARK GRAY: "Not Applicable"
  • GREEN: "Completed"
  • WHITE: Both "Open" and "Planned"
  • YELLOW: "In Progress"
  • ORANGE: "Overdue Critical Started"
  • RED: "Overdue Critical"
  • Special Indicators:
    • White with an Orange Border: Indicates an operation is overdue but still open or planned.
    • Yellow with an Orange Border: Signifies an overdue operation that is currently in progress.

Advanced Sorting and Filtering

Activity Codes: Each Operation is associated with an Activity Code, which groups one or more Operations belonging to the same WorkOrder.

Dynamic Filtering Options:

  • Row Filters: Users can filter operations based on the following criteria:
    • Plants
    • Systems
    • Subsystems
    • Zones
    • Equipment Groups
    • Equipment Types
    • Contractors
    • Operation statuses
    • Milestones
    • Punch Points
    • Tag numbers
    • WO/PO numbers
    • WO description
    • Planners
  • Column Filters: Here the user can define a set of colums/ActivityCodes that should be visible.

Custom Views: Filter configurations can be saved and later applied as custom views.