Jump to: navigation, search

Difference between revisions of "Admin Tool Jobs"


 
Line 11: Line 11:
  
 
Only if the Job Run was successful the duration will be displayed with the following format HH:MM:SS
 
Only if the Job Run was successful the duration will be displayed with the following format HH:MM:SS
 +
 +
All existing Jobs can be found here:
 +
[[Project_Page]]

Latest revision as of 09:00, 12 February 2025

IC Attention.png Work in progress!

Job Runs

For every executed Job a Job Run will be scheduled.

Job Runs.png

Every Job Run has a status. First, it is "Scheduled" then it switches to "Started" and the Interface Execution Timestamp gets set.
If the Job Run was successful it switches to "Sucess". Otherwise, it can either switch to "Error", "Conflict" or "Terminated"

Only if the Job Run was successful the duration will be displayed with the following format HH:MM:SS

All existing Jobs can be found here: Project Page