Jump to: navigation, search

Difference between revisions of "Admin Tool Jobs"


Line 5: Line 5:
 
For every executed Job a Job Run will be scheduled.  
 
For every executed Job a Job Run will be scheduled.  
  
[[File:JobRuns.png]]
+
[[File:Job Runs.png]]
  
Every Job Run has a status. First, it is "Scheduled" then it switches to "Started". <br>
+
Every Job Run has a status. First, it is "Scheduled" then it switches to "Started" and the Interface Execution Timestamp gets set. <br>
 
If the Job Run was successful it switches to "Sucess". Otherwise, it can either switch to "Error", "Conflict" or "Terminated"
 
If the Job Run was successful it switches to "Sucess". Otherwise, it can either switch to "Error", "Conflict" or "Terminated"
  
 
Only if the Job Run was successful the duration will be displayed with the following format HH:MM:SS
 
Only if the Job Run was successful the duration will be displayed with the following format HH:MM:SS

Revision as of 16:47, 11 February 2025

IC Attention.png Work in progress!

Job Runs

For every executed Job a Job Run will be scheduled.

Job Runs.png

Every Job Run has a status. First, it is "Scheduled" then it switches to "Started" and the Interface Execution Timestamp gets set.
If the Job Run was successful it switches to "Sucess". Otherwise, it can either switch to "Error", "Conflict" or "Terminated"

Only if the Job Run was successful the duration will be displayed with the following format HH:MM:SS