Jump to: navigation, search

Difference between revisions of "Timesheets"


(Extracting Timesheets from Scopechanges page)
 
(duplicate)
Line 1: Line 1:
Time Sheets are attachments that document the time or cost of work done for a certain Operation. These can necessary for Operations with a Price Type of ''Running Cost'' or ''Hourly Rate''.
+
Please use [[Time_Sheets]] instead.
 
+
[[File:SC_TSIndicator.png|800px|thumb|none|Timesheet-enabled operations are marked with the above indicator in both the Workorder and Operation views.]]
+
 
+
 
+
Time Sheets can be enabled for an Operation:
+
* During turnaround/shutdown planning by setting the Price Type.
+
* During execution by clicking the ''Enable Timesheets'' button, found in the Activity Details area of an operation.
+
** Visibility of this button is limited by user rights.
+
 
+
 
+
{{Hint|All Time Sheet-Enabled Operations can be viewed by navigating to the [[Scope_Changes#Overview_of_Scope_Changes_and_Time_Sheets|Scope Changes module]] in the MaTaP client.}}
+
 
+
 
+
== Time Sheet-Enabled Work ==
+
If Time Sheets are enabled, a dedicated tab is added to the Activity Details area where contractors can attached documents to log their work.
+
 
+
 
+
[[File:SC_TStab.png|800px]]
+
 
+
 
+
A new
+
  
 
[[Category:MaTaP|Timesheets]]
 
[[Category:MaTaP|Timesheets]]
 
[[Category:MaTaP UWP|Timesheets]]
 
[[Category:MaTaP UWP|Timesheets]]

Revision as of 16:28, 8 January 2025

Please use Time Sheets instead.