== Timesheet-Enabled Work ==
+
== Time Sheet-Enabled Work ==
 
If Time Sheets are enabled, a dedicated tab is added to the Activity Details area where contractors can attached documents to log their work.  
 
If Time Sheets are enabled, a dedicated tab is added to the Activity Details area where contractors can attached documents to log their work.  
  
Line 33: Line 33:
 
<br>
 
<br>
  
[[Category:MaTaP UWP|Time Sheets]]
 
 
[[Category:MaTaP|Time Sheets]]
 
[[Category:MaTaP|Time Sheets]]
 +
[[Category:MaTaP UWP|Time Sheets]]

Latest revision as of 16:15, 8 January 2025

Time Sheets are attachments that document the time or cost of work done for a certain Operation. These can necessary for Operations with a Price Type of Running Cost or Hourly Rate.

Timesheet-enabled operations are marked with the above indicator in both the Workorder and Operation views.


Time Sheets can be enabled for an Operation:

  • During turnaround/shutdown planning by setting the Price Type.
  • During execution by clicking the Enable Timesheets button, found in the Activity Details area of an operation.
    • Visibility of this button is limited by user rights.


IC Hint square.pngAn overview of all Time Sheets can be viewed in the Scope Changes module in the MaTaP client.

Time Sheet-Enabled Work

If Time Sheets are enabled, a dedicated tab is added to the Activity Details area where contractors can attached documents to log their work.


SC TStab.png


A new Timesheet can be added by clicking the Add Timesheet button. For each added Timesheet, the contractor must input the Cost and a brief Description of their work. The cost of all attached invoices is tracked as the Running Cost on that operation.

The documents can be viewed (opens up a relevant external app on the same system), and exported after execution.


Budgeting

If a budget has been set for a particular operation, the Running Cost is shown in relation to the overall budget, with a bar showing the overall progress.

IC Attention.png Attaching a Timesheet that would go over the budget for that particular operation will be rejected (as shown with Declined status above).