− | + | '''Advanced Visualization''': The Turnaround Wallpaper displays WorkOrders and Operations. Operations are each enriched with data such as the responsible company, early start date, late finish date, and the current status using a color-coded system. | |
− | + | '''Interactive Grid Layout''': Users can navigate through project data via a scrollable grid. This grid includes fixed row headers that are each a WorkOrder and column headers that are each an Activity Code. Operations are categorize according to their WorkOrder and Activity Code. | |
= Detailed Visualization and Interaction = | = Detailed Visualization and Interaction = | ||
Line 16: | Line 16: | ||
** White with an Orange Border: Indicates an operation is overdue but still open or planned. | ** White with an Orange Border: Indicates an operation is overdue but still open or planned. | ||
** Yellow with an Orange Border: Signifies an overdue operation that is currently in progress. | ** Yellow with an Orange Border: Signifies an overdue operation that is currently in progress. | ||
+ | |||
+ | = Advanced Sorting and Filtering = | ||
+ | '''Activity Codes''': Each Operation is associated with an Activity Code, which groups one or more Operations belonging to the same WorkOrder. | ||
+ | |||
+ | '''Dynamic Filtering Options''': | ||
+ | * '''Row Filters''': Users can filter operations based on the following criteria: | ||
+ | ** Plants | ||
+ | ** Systems | ||
+ | ** Subsystems | ||
+ | ** Zones | ||
+ | ** Equipment Groups | ||
+ | ** Equipment Types | ||
+ | ** Contractors | ||
+ | ** Operation statuses | ||
+ | ** Milestones | ||
+ | ** Punch Points | ||
+ | ** Tag numbers | ||
+ | ** WO/PO numbers | ||
+ | ** WO description | ||
+ | ** Planners | ||
+ | * '''Column Filters''': Here the user can define a set of colums/ActivityCodes that should be visible. | ||
+ | |||
+ | '''Custom Views''': Filter configurations can be saved and later applied as custom views. |
Revision as of 13:53, 21 May 2024
Key Features
Advanced Visualization: The Turnaround Wallpaper displays WorkOrders and Operations. Operations are each enriched with data such as the responsible company, early start date, late finish date, and the current status using a color-coded system.
Interactive Grid Layout: Users can navigate through project data via a scrollable grid. This grid includes fixed row headers that are each a WorkOrder and column headers that are each an Activity Code. Operations are categorize according to their WorkOrder and Activity Code.
Detailed Visualization and Interaction
Color-Coded Operation Tiles: Each operation tile is color-coded based on its status to provide quick visual cues about project progress:
- BLACK: "Undefined Status"
- DARK GRAY: "Not Applicable"
- GREEN: "Completed"
- WHITE: Both "Open" and "Planned"
- YELLOW: "In Progress"
- ORANGE: "Overdue Critical Started"
- RED: "Overdue Critical"
- Special Indicators:
- White with an Orange Border: Indicates an operation is overdue but still open or planned.
- Yellow with an Orange Border: Signifies an overdue operation that is currently in progress.
Advanced Sorting and Filtering
Activity Codes: Each Operation is associated with an Activity Code, which groups one or more Operations belonging to the same WorkOrder.
Dynamic Filtering Options:
- Row Filters: Users can filter operations based on the following criteria:
- Plants
- Systems
- Subsystems
- Zones
- Equipment Groups
- Equipment Types
- Contractors
- Operation statuses
- Milestones
- Punch Points
- Tag numbers
- WO/PO numbers
- WO description
- Planners
- Column Filters: Here the user can define a set of colums/ActivityCodes that should be visible.
Custom Views: Filter configurations can be saved and later applied as custom views.