|
|
| (One intermediate revision by the same user not shown) |
| Line 1: |
Line 1: |
| − | Time Sheets are attachments that document the time or cost of work done for a certain Operation. These can necessary for Operations with a Price Type of ''Running Cost'' or ''Hourly Rate''.
| + | Please use [[Time_Sheets]] instead. |
| − | | + | |
| − | [[File:SC_TSIndicator.png|800px|thumb|none|Timesheet-enabled operations are marked with the above indicator in both the Workorder and Operation views.]] | + | |
| − | | + | |
| − | | + | |
| − | Time Sheets can be enabled for an Operation:
| + | |
| − | * During turnaround/shutdown planning by setting the Price Type.
| + | |
| − | * During execution by clicking the ''Enable Timesheets'' button, found in the Activity Details area of an operation.
| + | |
| − | ** Visibility of this button is limited by user rights.
| + | |
| − | | + | |
| − | | + | |
| − | {{Hint|All Time Sheet-Enabled Operations can be viewed by navigating to the [[Scope_Changes#Overview_of_Scope_Changes_and_Time_Sheets|Scope Changes module]] in the MaTaP client.}}
| + | |
| − | | + | |
| − | | + | |
| − | == Time Sheet-Enabled Work ==
| + | |
| − | If Time Sheets are enabled, a dedicated tab is added to the Activity Details area where contractors can attached documents to log their work.
| + | |
| − | | + | |
| − | | + | |
| − | [[File:SC_TStab.png|800px]]
| + | |
| − | | + | |
| − | | + | |
| − | A new
| + | |
| − | | + | |
| − | [[Category:MaTaP|Timesheets]]
| + | |
| − | [[Category:MaTaP UWP|Timesheets]]
| + | |
Latest revision as of 16:28, 8 January 2025
Please use Time Sheets instead.