Jump to: navigation, search

Difference between revisions of "SubSystem Assignment"


(Created page with "== Object Linkages == * '''WorkOrder''': Can link to a '''SubSystem''', '''Equipment''', or '''FunctionalLocation'''. * '''Equipment''': Can link to '''FunctionalLocation'''...")
(No difference)

Revision as of 10:57, 30 October 2024

Object Linkages

  • WorkOrder: Can link to a SubSystem, Equipment, or FunctionalLocation.
  • Equipment: Can link to FunctionalLocation and/or SubSystem.
  • FunctionalLocation: Can link to a SubSystem.

SubSystem Assignment Priorities

Equipment SubSystem

  • FunctionalLocation (Highest Priority): If an Equipment is linked to a FunctionalLocation, its SubSystem is automatically set to match the FunctionalLocation. Manual changes are not allowed.
  • Equipment (Default): If no FunctionalLocation is linked, the SubSystem can be set manually on the Equipment.

WorkOrder SubSystem

  • FunctionalLocation (Highest Priority): If a WorkOrder is linked to a FunctionalLocation, the SubSystem is set to the FunctionalLocation. Manual changes are not allowed.
  • Equipment (Second Priority): If no FunctionalLocation is linked, but an Equipment is linked, the WorkOrder’s SubSystem is set to the Equipment. Manual changes are not allowed.
  • WorkOrder (Default): If no FunctionalLocation or Equipment is linked, the SubSystem can be set manually on the WorkOrder.

Update Conditions

  • FunctionalLocation SubSystem Changes: Update all linked WorkOrders and Equipments to match.
  • Equipment SubSystem Changes (if no FunctionalLocation linked): Update linked WorkOrders to match the Equipment.